What a maintenance contract can and cannot buy

Response time is the least useful thing in most HVAC contracts

It is also the thing they are sold on. Here is what we think is actually worth paying for on a commercial site, what to ask before you sign anything, and why we do not offer a 24-hour guarantee ourselves.

Start here

Downtime is made of four things, and only one of them is how fast somebody arrives

When a unit fails, the clock runs through four stages: how long before anybody notices, how long before a technician is on site, how long to diagnose it, and how long to get the part. On most commercial failures the fourth stage is the longest by a wide margin, and the second is the shortest.

Which means a contract that shortens stage two by four hours, and says nothing about stages one, three or four, has improved the smallest number on the list. Meanwhile a five-dollar contactor held on a shelf can remove three days, and a sensor that tells you a room is drifting at eleven at night can remove a whole morning.

So the useful questions are: what stops when this stops, and what would actually shorten it? Both below.

Work it through

What stops, and what cover you have now

Nothing is sent anywhere and nothing is recorded. This is what we would ask you at a first meeting.

Read what “response” means in your contract before you rely on it — and know that we do not sell one

Response guarantees are the easiest thing in this trade to sell and the hardest to honour. Three things are worth checking in the document you already have, and all three are usually in it.

What counts as a response. In a great many contracts it is a telephone call returned, not a technician on site. If the clause says “respond” rather than “attend”, the guarantee is about answering the phone.

What the remedy is. Usually a credit against the contract fee. If missing the target costs the contractor a small refund and costs you a day of trading, the clause is not protecting you, it is pricing an apology.

What is excluded. Parts not held, equipment past a stated age, refrigerant, anything requiring a crane or roof access outside hours, and periods of exceptional demand — which is to say a heat wave, which is to say precisely when you will need it.

And about us, plainly: we do not offer a 24-hour guarantee, because we could not honour it in August across this valley and we would rather not take money for it. What we will do instead is tell you in writing which units we hold parts for, what our realistic attendance looks like in and out of season, and what a temporary measure is for each critical space. If a guarantee genuinely matters more to you than that, take it — but read the three clauses above first, from whoever is offering it.

Our answer

Buy spares and a temporary plan, not a faster van

Where a failure empties the room, the money is in never reaching the failure and in having something to do on the day. Both are cheaper than a premium response clause and both work at three in the morning.

What we would do: identify the two or three components on each critical unit that actually fail — contactors, capacitors, motors, control boards — and establish which are held locally and which come from out of state. Hold the out-of-state ones yourself. They are small, they do not perish, and they turn a three-day wait into an afternoon.

And write down the temporary plan before you need it: what portable equipment can be hired locally, from whom, how long it takes, and whether your electrical supply can take it. The worst time to discover the answer is the day you are asking staff to send people home.

About trading specifically

Work out what an hour closed actually costs you, once, and write it down. Every decision on this page becomes easy afterwards, and most of them turn out to be cheaper than the number.

With no cover at all

Perfectly reasonable on a site where nothing stops, and expensive on a site where something does. The cheapest first step is not a contract — it is one survey that establishes what is installed, how old it is and what condition it is in. Until that exists, any contract you are offered has been priced on assumptions about your building.

In every case

Four questions for anybody quoting you a contract

  • What exactly is measured at a visit?

    As a list, with units. Without it, two prices are not comparable and the cheaper one is usually a shorter visit rather than a better rate.

  • Which parts do you hold for my equipment?

    Named. This does more for real downtime than any response clause, and the answer tells you immediately whether they have looked at your units or at a template.

  • Does “response” mean attendance, and what happens if you miss it?

    If the remedy is a credit against the fee, the clause is priced rather than guaranteed. Worth knowing before it matters, not afterwards.

  • Do I get the records, and in what form?

    They describe your building. You should hold them, and you should be able to hand them to another contractor without asking permission.